The Subsea7 project was awarded to iGAS back in August 2011and is currently in the final stages of installation and commissioning in Schiedam, Netherlands. iGAS have been on-board since May 2012. The ‘turnkey’ project is for a new gas supply and distribution system for the Borealis pipe lay vessel.
The scope includes the full engineering, design, supply, install and commissioning of:
iGAS were chosen by Subsea7 due to our experience in delivering gas supply and distribution technology and turnkey projects throughout Europe and beyond; utilising cost effective and advanced technology and design.
For more information please contact Robert Lee on +44 (0) 1483 268269 or r.lee@igas-ts.co.uk.