IGAS are delighted to announce the appointment of Richard Browne to the position of Controls Engineer.
Appointment – Richard Browne
August 18th, 2008Air Liquide Awards IGAS New Irlam Cylinder Filling Plant
May 27th, 2008Air Liquide has recently awarded IGAS the contract for their new cylinder filling plant in Irlam.
The scope includes engineering, design, install and commission to automatically fill: Pallets and bundles to settled pressures up to 230Barg with pure gases and mixtures (Oxygen, CO2, Argon and Nitrogen).
Green Management for Green Projects
February 15th, 2008The beginning of 2008 has seen a new chapter of projects for IGAS, all with a ‘green’ theme and an emphasis on renewable energy.
Several strategic projects and relationships are now established, to cover the following range of projects and systems: bio-methane recovery and liquification; LCNG & LNG fuelling stations; Waste to Plasma Energy Facilities; and tidal energy harnessing. All with great potential for positively contributing to present and future environmental concerns.
Major Project Completion – New Mixed Gas Cylinder Filling System & Automated Gravimetric Cylinder Filling System
December 19th, 2007IGAS has just completed a brand new Cylinder Filling facility for Yara Praxair AS in Oslo, Norway in September 2007. Yara Praxair AS awarded the programme to IGAS on a full ‘turnkey’ basis. The project was successfully completed in Yara’s all new cylinder filling building based in Oslo.
IGAS Introduces Range of Pipe, Tube & Fittings
September 18th, 2007IGAS now stock and supply a wide range of standard pipe, tube and fittings for all types of industrial gas plant.


